The Acute Care Pavilion at the Queen of the Valley Medical Center is a state of-the-art 4-story structural steel frame facility 72,000-square-foot addition that enhances the quality of healthcare to Napa residents. Construction of the surgery and intensive care unit began in May 2010, and was completed by spring 2013. This project was designed to satisfy all LEED requirements for “green” health care facilities making it one of the first environmentally friendly facilities in the Napa area.
Signet provided special inspection and materials testing services for this project including soils/AC compaction testing and observation, concrete placement, shotcrete, masonry, asphalt, AWS-CWI structural steel/NDT, welding, metal decking, fireproofing and dowel/anchor installation.